---
title: "Prefix Executability: Evaluating Tool-Using Agents Beyond Final Success"
source: "arXiv AI/CL/LG（论文）"
source_tier: "t2"
url: "https://arxiv.org/abs/2610.40444v1"
permalink: "https://feed.astralor.com/items/itm_22f89171d2f0eb310e11d72d"
published: "2026-10-29T16:58:04.000Z"
score: 57
channel: "ai"
tags: ["AI Agent","Prefix Executability","Evaluating Tool-Using Agents","Beyond Final Success","Tool-use","Prefix Executability Curves","PEC"]
---

# Prefix Executability: Evaluating Tool-Using Agents Beyond Final Success

## At a glance

Tool-use benchmarks often score agents by final task success, but terminal outcomes can obscure whether the intermediate tool-call trajectory was executable. We propose prefix executability as a trajectory-level evaluat…

## Key points

- Tool-use benchmarks often score agents by final task success, but terminal outcomes can obscure whether the intermediate tool-call trajectory was executable.
- We propose prefix executability as a trajectory-level evaluation protocol for tool-using agents.
- The protocol measures whether every prefix of a predicted tool-call sequence remains executable under tool schemas, state preconditions, and data dependencies, and summarizes reliability using Prefix Executability Curve…

## Full text

Tool-use benchmarks often score agents by final task success, but terminal outcomes can obscure whether the intermediate tool-call trajectory was executable. We propose prefix executability as a trajectory-level evaluation protocol for tool-using agents. The protocol measures whether every prefix of a predicted tool-call sequence remains executable under tool schemas, state preconditions, and data dependencies, and summarizes reliability using Prefix Executability Curves (PEC), First-Error Depth (FED), Trajectory Executability Rate (TER), horizon-normalized AUC-PEC, and Recovery Rate (RR). We instantiate the protocol on stratified samples from BFCL-v3 multi-turn and ToolSandbox, and on the complete Airline/Retail base splits of $τ^3$-bench. We observe that outcome-only and prefix-level rankings diverge: agents whose execution is conditioned on an unverified plan often achieve higher point-estimate final success than non-plan-conditioned baselines while substantially lowering TER and AUC-PEC. These divergences are precisely the failure modes that prefix executability is designed to expose: they reveal whether apparent success rests on an executable trajectory, where invalidity first enters, and whether success follows recovery from an earlier failure. As a validation intervention, explicit pre-execution plan checking can improve executable-prefix survival while maintaining competitive terminal success. These results show that final success alone is insufficient for evaluating tool-use agents and that prefix-level executability provides an actionable reliability signal for comparing agents, diagnosing failures, and assessing validation mechanisms.

---

Verify against the original before citing; curated by Astral Feed: https://feed.astralor.com/items/itm_22f89171d2f0eb310e11d72d
