---
title: "Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner"
source: "arXiv AI/CL/LG（论文）"
source_tier: "t2"
url: "https://arxiv.org/abs/2611.30179v1"
permalink: "https://feed.astralor.com/items/itm_74189148185a2f7ab86707fe"
published: "2026-11-23T07:24:57.000Z"
score: 59
channel: "tech"
tags: ["AI Agent","安全","Trustworthy","Sustained","Flown","AKR","Under"]
---

# Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner

## At a glance

Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outsid…

## Key points

- Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment.
- Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution.
- We formulate these operations as safety-constrained contingent planning with irreversible actions, erroneous records, three-valued physical evidence, and costly, deadline-constrained sensing.

## Full text

Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution. We formulate these operations as safety-constrained contingent planning with irreversible actions, erroneous records, three-valued physical evidence, and costly, deadline-constrained sensing. We propose asymmetric knowledge-level replanning (AKR), which treats the planner as an untrusted black box: reversible actions run on the planner's assumptions, and irreversible actions run only after a minimum-cost sensing cover verifies every precondition. Under sound measurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA$\rightarrow$PLEXIL procedures completed none.

---

Verify against the original before citing; curated by Astral Feed: https://feed.astralor.com/items/itm_74189148185a2f7ab86707fe
